OpenPlant PID Help

To Place a Pump

  1. Select a pump from Pumps taskbar. (Example: Horizontal Centrifugal Pump)
    Note: The Pump User Cell placement procedure is a little different than a standard pump option. Please see the How To on this procedure for more information.
  2. Pick a point in the drawing for the pump, or enter the coordinates for the insertion point. The component is placed in the drawing.
  3. Enter the mirror point by picking a point either to the right or left of the pump. This determines the direction of the discharge port. The Properties dialog opens.
  4. Define the Tag Number for the pump, or accept the default number.
  5. In the Properties section, define the property values for the pump.
  6. Press OK.
  7. Next either:

    Pick a point in the drawing to place the tag number annotation for the pump.

    or

    Right-click to complete the placement and terminate the command.